Cal Energy Co. - Design, preparation of specifications and
drawings, bid evaluation, selection of general and QA/QC contractors, construction
management and interaction with agency representatives for $2.7 million
Landfill project.
Forbes Management, Inc. - Gem Theatre Relocation project. McDowell &
Associates completed a Phase I ESA, a Phase II Subsurface Investigation
(integrated with the site Geotechnical Investigation to provide cost
savings to the client), and a category "A" BEA with Section 7a
Compliance Analysis. Affirmative Determination received from MDEQ. See Detail.
The Dow Chemical Co. - Conceived and designed a 4 mile-long
hydrodynamic groundwater control system using fully and partially
penetrating drain tile, including single and multiple pumping wells. This
system is one of the largest and most intricate groundwater containment systems
in Michigan.
Toll Brothers, Inc. - Premier residential subdivision with Arnold
Palmer Golf Course, including demolition, remediation and re-development of
former government complex with multiple UST's, former structures, and coal
cinder fill area. Geotechnical investigations, Phase I & II ESA and
Closure Reports, Geotechnical Consulting, and Construction Testing Services
for engineered fill and construction, for residential homes, streets,
utilities, and retaining walls.
Elton Engineering - Geotechnical Investigations and Consulting on
250 County Bridges in Lapeer, St. Clair & Sanilac Counties for
Retaining Walls, Structure Foundations, Earth Retention Systems, Cofferdam
Design, Excavation Stability, Settlement Analysis, Dewatering, Ground
Improvements and Mechanically Stabilized Earth Slopes.
Petro Chemical Dow, Chile - Site Assessment, Feasibility Study, Closure
Design, Conceptual Treatment Design, Construction Management for a Landfill
Closure that included a Slurry Wall, HDPE & Soil Cap, Monitoring Wells
and Groundwater Stripping Treatment Plant.
U.S. Army Corps of Engineers,
Claremont Project Site -
Construction Management of Soil and Groundwater Remediation Project by
Thermo-Destruction of Soil Organics, Physical/Chemical Treatment of
Groundwater and Groundwater Re-injection.
Frankel Associates - Hydrogeological Study including Groundwater
Modeling, predictive evaluations and analysis to design/construct an
Interpretive Wetlands at Chippewa Nature Center. Work won MAPA Award in
1993 for innovative approach and project.
Ric-Man Construction - Geotechnical Consulting and Design of Earth
Retention Systems, including Mechanically Stabilized Earth, Sheet Piling,
Soldier Piling and Lagging, Tunneling, Excavation Stability, Grouting and
Dewatering for the Western Townships Utilities Authority Wastewater
Transportation System.
Toebe Construction - Geotechnical Instrumentation and Vibration
Monitoring of construction activities near of an existing sanitary sewer
interceptor during construction of the Davison Freeway.
The Dow Chemical Co. - Air Sparge and Vapor Extraction Well Design and
Installation (100+ wells) and Project Management Oversight for remediation
system at Beaver Creek Site, Grayling, Michigan.
Waste Management Inc. - Monitoring Well Installation for Eagle Valley
Landfill, Orion, Michigan. Drilling project total was $60,000.
City of Midland - Development and negotiation of Hydrogeologic
Monitoring Plan for expansion of City of Midland Landfill, Midland,
Michigan. Project included determination of bedrock using geophysical
techniques, evaluation of aquifer chemical characteristics, geotechnical
evaluation of natural clay subgrade, monitoring well abandonment and
installation.
|